While the university was closed down for Winter time break, they were supposed to be doing repairs on the HVAC method at the building.
I had heard them talking about this and having all kinds of discussions about this topic at strange PTA meetings for weeks, lots of times it even got into a heated argument.
Many parents guess love the indoor air conditions in the university building is genuinely subpar, and everyone wants the university board to do something about it, after a lot of complaining and signing of petitions, they finally told us that they were going to do it. The one catch was the fact that they would have to hire a commercial HVAC company to come in and do the work over Winter time chop while there were no students in the building. I think that was a fantastic method because everyone seemed to agree with it. They found a commercial HVAC business for the job and the company seemed love a fantastic one that would be dependable. I found out that the HVAC company was supposed to be starting on the job the afternoon after the adolescents got out for Winter time break, however every time I drove by the university it didn’t look love there was anyone at all in the building. I started to wonder if they were ever going to get the job done at all; By the time Winter time chop was over, I still had not seen any HVAC trucks around. It turned out that the HVAC business had taken the money and then she just ran away! I think she wasn’t all that dependable after all!